Yesterday’s New York Times has a great overview on the the elephant in LEED’s room. The story, “Some Buildings Not Living Up to Green Label,” by Mireya Navarro, discusses how many buildings aren’t as efficient as they were planned to be, or should be.

It’s a good overview for those who don’t already live the problems and issues discussed in it. Though the article discusses a very valid question, I don’t know that it’s really fair, considering the

Should your building get retested?

Should your building get retested?

USGBC did not even require a LEED building be more energy efficient than a standard building until June of 2007. Plus, both the main building cited in the article and the study of 121 buildings mentioned in it looked at buildings certified through 2006. (Doing a similar study looking at buildings designed and built since then would be fascinating but I digress.)

Anyhow, what I find most interesting is the last line of the story where Scot Horst of the USGBC says LEED may eventually move towards the EPA’s Energy Star Model where buildings must attain the label each year in order to keep it. “Ultimately, where we want to be is, once you’re performing at a certain level, you continue to be recertified,” he said.

This raises two main questions in my mind. First, if that’s where the USGBC wants to be, why isn’t it there now? LEED 2009 has some major changes in it, but it will be another couple years until the next version is released. I understand that LEED is still a growing tool (and money-maker) but if this is really the way it will be in the end, why not just bite the bullet and figure out a way to incorporate the goal now? The Living Building Challenge had some pretty audacious goals as a part of its first incarnation. Why can’t LEED make these changes now?

Which brings me to my other main question. Is the idea of making LEED something that can be rescinded even realistic? While there is no denying that it would be valuable to require LEED buildings be tested every year to retain their certification, LEED is an investment and an expensive one at that. Would it become a less attractive investment from a business perspective if your pretty little plaque could disappear due to let’s say a crummy building manager?… or to a changing system? What if further versions of LEED required changes that you simply couldn’t add on to a building. Would you be penalized and lose your certification because you, or the person you bought a building from, didn’t make a significantly different decision in design?

Maybe commissioning should become a required part of LEED. But that also adds costs to a project.

What do you think?

New addition to the DJC family: a portion of highway to clean

Thursday, August 27th, 2009

The DJC has adopted a portion of highway on Interstate 90, east of Issaquah. Here’s a picture of the handy sign to prove it:

Yay DJC!

Does solar work in Seattle? Yes, if you’re the aquarium…

Tuesday, August 18th, 2009

Teams install the solar panels

In June, the Seattle Aquarium installed its first solar hot water demonstration system. The system preheats water used in the second flood cafe by way of five solar panels that are located on the building’s south facing wall.

A press release from A&R Solar Corp., the company that installed the system, says the solar system isn’t just doing well. It says the solar collectors are offsetting almost double their expected amount. Reeves Clippard, president and co-founder of the company, said if solar works this well in Seattle, “the rest of the country has no excuse not to act now.”

Honestly, I don’t really know what to make of this. It’s a good thing that the system is performing so well. But a system that produces double what the models said it would makes me wonder what exactly that baseline was. Then again, we have had an amazingly hot, bright and sunny summer.

The system has a monitoring device that will eventually allow visitors to see how it is performing in real time. It uses Heliodyne Gobi flat-plate solar hot water collectors.

An outside view of the solar and the aquarium

Looking up at the panels

Zero waste: betraying our mission?

Friday, August 14th, 2009

This is a guest post by Dave Bennink, owner of Re-Use Consulting.

I recently was asked to speak at the California Resource Recovery Association Conference in Palm Springs.  I know, Palm Springs, it sounds like a vacation, but the high for each day was 112 degrees.  Anyway, this year’s theme was ‘zero-waste’.  The CRRA had asked me to discuss building deconstruction in the context of it helping to achieve zero waste goals in many California cities.  It caused me to pause and think about what zero waste means and how to achieve it.  I came up with a couple of interesting points.

Betraying the mission:

Some of the projects that I have been involved with or have read about that have strived for zero-waste or very high diversion rates may have succeeded in doing so, but at what cost?  It may have taken weeks to accomplish and cost much more than demolition.  Therefore, even though the project stands as an example of what is possible, the general public may see this as confirming their belief that building deconstruction (and perhaps other green building methods) cost too much and take too long

Looking at this another way, we see that the single project may divert 70 tons from the landfill during

Is this going to a site or from one?

its 3.6 week schedule.  A less agressive approach that we frequently follow would divert 60 tons in 1.2 weeks or 180 tons during the same 3.6 week schedule.  So, in the end, who is closer to zero-waste? 

There are different ways to achieve zero-waste, by achieving zero-waste on one project and building off of that and using it as a bar that others can reach, or to achieve high-diversion on 10 projects at a cost-competitive price and time-sensitive schedule.  In the end, we really do need the zero-waste projects to push us forward, we just need them to admit that we still have a ways to go before achieving zero-waste on a regular basis. 

Designing for disassembly:

When planning our presentation, we reviewed past projects that we had completed and sent the materials in three directions: reuse, recycling and disposal.  Our focus was on how we could have eliminated the disposal category on projects performed in the ‘real world’.  Our conclusion was that if we design waste into a structure, it is not surprising that we get waste out of projects. 

Designing for disassembly is a movement in architecture to admit that their structures will likely not live out their entire lifespan and that when the building is removed someday in the future, the materials that make up that structure will be worth harvesting and that the design should favor this disassembly.  The more fasteners, ADHESIVES, and other waste producing or labor consuming building systems that are battled when the building is taken apart, the more unlikely that deconstruction will be a viable choice for building removal. 

Having deconstructed 500 structures in the last 16 years, RE-USE Consulting has gained a unique perspective on this problem and is moving ahead with its own solutions to be applied to today’s buildings.  We hope that tomorrow’s buildings will be made of reusable panels that can be reused and are perhaps constructed on multiples of 16″ or 24″, floating floor panels, paneling set in channels with fewer fasteners, and well thought out use of adhesives.  

I have seen what zero waste looks like.  It is an amazing thing.  Imagine a job site where the building was removed and the stacks of materials sitting on the ground confuse the passer-by.  Is a building about to be built, or did it just come down? 

Should we focus first on zero-waste, or should we focus on increasing the percentage of materials that are diverted for reuse?  In the end, the reuse of materials can be many times better than simply recycling them due to the preservation of energy, job creation associated with it, and from resource conservation.

To support green buildings should codes stay the same, be reworked or be reinvented?

Friday, August 7th, 2009

On Thursday, the DJC published an article I wrote on a new report that says codes are getting in the way of cutting edge green buildings. This, in itself, is really nothing new.  Last August, I wrote this article about the city’s Priority Green program. In it, DPD’s Peter Dobrovolny (whose last name is almost as difficult as mine!) said many projects consider innovative ideas but drop them when they realize how much extra time it will take under city code. However, having the problems and possible solutions written down in an actual report - well that is new.

However, the report. Is. Huge. If you dare to read it, click here . It manages to be very

The Rubik's Cube of codes

comprehensive and vague at the same time. It is comprehensive in that it studies code barriers across the country, identifies problems and makes recommendations. But because it is dealing with national issues, some of the solutions are vague in their range. For example, one solution is to “identify and address regulatory impediments to green building and development” while another is to “create incentives matched with desired goals.”

I spoke with one of the study’s primary authors, David Eisenberg of the Development Center for Appropriate Technology, this week. Essentially, he said codes are built incorrectly in that they are hundreds of ad hoc responses to problems. Codes, he said, should instead be built comprehensively to support a specific kind of development or project. Basically, he said the entire system needs to be rebuilt.

Ouch.

In Seattle, it can take months or years for changes (especially large ones) to occurr. Can you imagine what it would take to wipe out all the city departments responsible for allowing development to get built… and then to rework the system from scratch? 

Eisenberg said he realizes that what he’s asking might be impossible. But even if it is impossible, by voicing the idea, he hopes to get people talking about it. Everyone - he said - whether it’s greenies or permitting people or anyone really - wants healthy buildings. And our current code system does not encourage healthy buildings because it pawns risks relating to climate change and environmental degradation off on future generations.

What do you think about all of this, dear readers? Is there any possibility that our overall codes could be reworked and if so, what would you want them to encourage? Here in Seattle (where we are pretty progressive in environmental issues, at least compared with some parts of the country) do we even need to be considering reworking the system or do we need to tweak it? If you could totally rework one code or issue, what would it be?

AIA Seattle seeks writers on “design for healthy living”

Thursday, August 6th, 2009

The AIA Seattle’s Forum magazine is seeking submission proposals for an upcoming issue on design for healthy living. Proposals for features run up to 2,500 words and columns run between 600 and 700 words. Proposals must address some aspect of design for healthy living in the Seattle metro area, Puget Sound or Washington state.

For more info on Forum or the submission process, visit http://www.aiaseattle.org/forum . Proposals are due by August 21.