Archive for June, 2013

King Street Station Can Transform the City

Monday, June 24th, 2013

Seattle has invested a great deal in King Street Station and the surrounding area, why not go a little further and make it a world-class transit hub?
Out of the three designated hubs in downtown Seattle, King Street is arguably the primary transit hub bringing together Amtrak, streetcar, local and regional bus, and light rail. In the not too distant future, rapid ride from West Seattle and access into downtown from SR-99 will both have significant impacts to this area. Using the already congested street grid to transfer between systems is not a coordinated nor safe approach for transit riders.  

Transbay Transit Center is anticipated to have a patronage of 100,000 every weekday and 45 million annually. Photo credit: © Pelli Clarke Pelli Architects

All the transit systems in the hub are just a block or two away from where you hoped they would be.  Light Rail is a trek across 4th from King Street Station; bus stops on Jackson are one-two blocks away; and the First Hill streetcar stops are a block or two in either direction. The City and transit agencies need to think bigger, in a way that leverages the investments in this hub including the restoration of the historic station, the North Lot, Union Station, and the Stadium District. In early thinking about the North Lot there was an idea proposed that included a significant bus terminal proposed for 4th Ave S over the BNSF tracks- this would provide the opportunity to create a stacked connection including Sounder, local bus, and perhaps an underground connection to Link. It’s time to start thinking about this facility now so that the promise of a real transit hub can be realized and the benefits of investment in the neighborhood can bring about real change.  Change that’s been planned for in the Livable South Downtown Plan.

The experience of San Francisco has an uncanny comparison.
Downtown San Francisco is a maze of cranes these days and the 6-block long gaping hole next to Mission Street that will become the Transbay Transit Center is a healthy contributor to the current crane count. With an anticipated patronage of 100,000 every weekday and 45 million annually, Transbay will be one of the largest transit hubs on the West Coast. From local rail and bus service to Amtrak and Greyhound, Transbay will provide the hub for more than 8 transit agencies including Caltrain and High Speed Rail. Originally built in 1939 to handle electric trolley service (and later bus service) from the newly constructed Bay Bridge, the original building was razed and along with several earthquake related ramp removals that provided the real estate and a significant source of funding for the new Transbay Center. The new Transbay was conceived in 2008 and is to be completed in 2017. But even the 70’ deep hole in Soma is already spurring development including the Transbay Tower- planned to be 200′ taller than the Transamerica pyramid.
Seattle has the opportunity now to rethink how transit systems come together at King Street Station and to create a world-class transit center befitting a world-class city.

The sidewalk observed: building a better street corner

Monday, June 17th, 2013
Successful street corner at 36th Ave SW and SW Snoqualmie St in West Seattle. Photo by Nate Cormier.

Last time I promised to contrast that miserable corner of 35th Ave SW and SW Avalon Way in West Seattle with something more gracious. This one is three blocks away at the corner of 36th Ave SW and SW Snoqualmie St. The context is quite different in terms of available right of way, traffic volumes and level of investment by the adjacent developer, but my interest here is in highlighting some of the aspects that make it a successful street corner.

• There are wide and nicely landscaped curb bulbs to slow traffic and buffer pedestrians at the corner from passing automobiles.
• The building entry is close to the intersection with decent transparency to the lobby so there should be a good amount of foot traffic and eyes on the street here.
• There is a seating area near the intersections for passersby to take a break. This is particularly valuable for seniors and others that pause frequently while walking. Hopefully once they lease up the apartment building they can get rid of those plastic signboards.
• There is a broad area between the ramps that is separated by a curb from turning traffic. This makes waiting to cross feel safer.
• The curb ramps align with the sidewalks and the unmarked crosswalks so the visually impaired can more easily guess the correct angle to make their way to the paired ramp on the other side of each street. Note that this leaves a triangular bit at the bottom of the ramp that needs to be carefully graded to not collect water.
• Finally, and this one is tiny, but the attention to detail is sweet…where the tactile warning strips meet adjacent curbwalls, there are subtle joints aligned with the tactile tiles. They may play a role in controlling cracking of the curb, but I like how they make those tactile strips appear rooted intentionally in those locations. Too often tactile warning strips look glued on as afterthoughts. Not here.

All in all, a solid contribution to the public realm!