|
# 13
|
|
ENGINEERING TEACHING RESEARCH LAB
Project description: A four-story, 116,565 square foot engineering teaching research building with an upper level mechanical penthouse, structural steel braced framing system, masonry, architectural precast concrete and aluminum window/curtain wall envelope, and standing seam metal roofing. project also involves a skybridge to another building and landscaping.
- Address: Washington State University main campus, Pullman.
- Original contract amount: $16,265,000
- Start of construction: April 1996
- Expected completion date: January 1998
- Contractor: Swank Enterprises, 115 West Nevada, Kalispell, MT 59901. 406-752-5411
- Architect: Callison Architecture Inc., 1420 Fifth Avenue, Suite 2400, Seattle, WA 98101. 206-623-4646
- Owner: Washington State University
- Project participants: Harry Johnson Plumbing; POE Asphalt; Segmental Systems; Hidden Rivers Irrigation; Meidling Concrete; Spiker Masonry; Inland Empire; LH Sowles; Cobra Corporation; Modern Drywall; JNJ Construction Supply; Inland Coatings; Pacific Construction Systems; Washington Glass & Glazing; Classic Tile; Bob Hull Interiors; CDC Services; Valley City Mfg.; Hobson Elevator; A-1 Master Crane; 3H Mechanical; Palouse Empire; Advanced Fire Protection; Palouse Country Electric; Riley Engineering.
Return to Top 20 top page
Copyright © 1997 Seattle Daily Journal of Commerce.