Whole Barracks Renewal, North Fort Lewis
|
Whole Barracks Renewal, North Fort Lewis
|
Project description: Construct a 300-person barracks of about 130,000 square feet; two 18,600-square-foot and one 22,000-square-foot company operations and supply buildings; three battalion headquarters buildings, each about 17,300 square feet; a 12,000-square-foot brigade headquarters building; a 15,000-square-foot dining facility; 400-square-foot guardhouse; and three miles of new road. Also includes widening existing roads.
Address: Corner of 41st Division Drive and 32nd Division Drive, Fort Lewis
Original contract amount: $43,710,000
Start of construction: June 1, 1997
Expected completion date: April 1, 1999
Contractor: Absher Construction Co., 8121 Shaw Road S.E., Puyallup, WA 98372, 253-845-9544
Architect: WJA, 1218 Third Ave., Suite 306, Seattle Tower, Seattle, WA 98101, 206-623-0331
Owner: U.S. Army Corps of Engineers, Seattle District
Project participants: Monarch Development; B&M Development; Harvard Steel Inc.; Woodworth & Co.; Modern Tile Inc.; Stripe Rite Inc.; Great Graphics & Signs; Petersen Brothers Inc.; Quick Crete Products Corp.; Natural Structures; Pole-Tech Co. Inc.; Mocon-Moen Construction Inc.; Realm Inc.; Holroyd Co. Inc.; Steel Systems Technology; Master Precaster Inc.; Keystone Masonry Inc.; Benco Fabricators Inc.; Anderson Specialties Co.; Corona Steel Inc.; RTB Co. Inc.; Powers West Corp.; Northwest Assoc.; Aluminum & Bronze Fabricators Inc.; Mywest of Idaho Inc.; Division Seven Waterproofing Inc.; Insulation Projects Inc.; Tile Technology Roofing Co.; MTR Sheet Metal Inc.; Northwest Fireproofing Inc.; Mosler Inc.; U.S. Door & Hardware; Steel Dog Door & Frame; Pacific Hardware; Gibson Door Inc.; Barclay Dean Architectural Products; Contractors Specialties; Aluminum Window Systems Inc.; Lacey Glass Inc.; Black Oak Construction Inc.; Acoustics Northwest Inc.; Armorclad Floors; Engineered
Storage Products; WJO
Flooring
Inc.; Dorse; CPC Equipment Inc.; Sarela Inc.; Evergreen Fire & Safety Inc.; Li'l Chief Specialties Inc.; Targeted Specialty Services Inc.; Doug Lent Mechanical; Reliance Fire Protection Inc.; Arcadia Electric Inc.; Potelco Inc.; Tyee Concrete Inc.; Caliber Concrete Construction Inc.; A.C.E. Inc.; PTL/PSI; Wy'East Construction Inc.; and Seattle Stud Welding Inc.
Copyright © 1998 Seattle Daily Journal of Commerce.
|