Port of Edmonds Marina Reconstruction
|
Port of Edmonds Marina Reconstruction
|
Project description: Project was a direct result of a natural disaster that occurred last year. An emergency cleanup was conducted by Hurlen Construction. This project includes installation of steel piles, concrete float systems, and a concrete and steel bulkhead.
Project also includes structural steel frame work, roofing and utilities for the reconstruction of a small boat harbor. The project consists of approximately 370 steel piles, a 90,000-square-foot floating dock, 240,000 square feet of roofing for covered moorage, fire water, potable water, an electrical system, five gangways and miscellaneous site work for the gangway access.
Address: 336 Admiral Way, Edmonds
Original contract amount: $11,793,221
Start of construction: July 1997
Expected completion date: Dec. 15, 1998
Contractor: MKB Constructors, 3647 Stone Way N., Seattle, WA 98103-8065, 206-634-1700
Engineer: Peratovich, Nottingham & Drage Inc., 811 First Ave., Suite 260, Seattle, WA 98104, 206-624-1387
Owner: Port of Edmonds
Project participants: Gehri Sheet Metal; Jesse Engineering; Dalton Electric; Bellingham Marine; Makers Architectural and Urban Planning; Sparling Inc.; and McGowan Broz Engineers Inc.