Ballard High School

Ballard High School

Ballard High School



Project description: Demolish the existing 1914 Ballard High School and build a new 240,000-square-foot school with steel framing and masonry veneer. The new two-story building will feature 65 classrooms. Its design will reflect the school's emphasis on science and technology education. Several design elements from the old school will be incorporated into the new facility, including a precast belt replicating the terra cotta bandcourse and pre-finished metal panels with a terra cotta look. Also, copper panels used around the windows of the old building will be re-installed in the new facility. It is projected that 1,600 students will initially attend the school.

Address: 1418 N.W. 65th, Seattle

Original contract amount: $35,137,500

Start of construction: Aug. 6, 1997

Expected completion date: Summer of 1999

Contractor: Kiewit Construction Co., Pacific Building Group, 4904 Lake Washington Blvd. N.E., Renton, WA 98056, 425-255-8333

Architect: Mahlum & Nordfors, McKinley Gordon, 2505 Third Ave., Suite 219, Seattle, WA 98121, 206-441-4151

Project manager: Heery International, Inc., 1326 Fifth Avenue, 8th Floor, Seattle, WA 98101, 206-587-0473

Owner: Seattle School District No. 1

Project participants: AAR Testing Laboratory Inc.; Acoustic Systems; Advanced Equipment Corp.; Aluminum Athletic Equipment; Anas Design Assoc.; Andgar Corp.; Armand R. Marion; Audio Acoustics; The Bentley Co.; Bike Security Racks Co. Inc.; Builders' Hardware & Supply Co. Inc.; Chas H. Beresford Co.; Clayton Environmental Consultants; Commercial Sound & Communications; D.A. Hogan & Assoc.; Seattle Department of Construction and Land Use; Douglas Industries Inc.; Drapery Blind Carpet; Emerald City Weatherproofers Inc.; Emerald City Erectors Inc.; Emerald Paving Inc.; Evergreen Fire and Safety; Fire Systems West; Foster Bray Co,; Frank Schelhamer; Fuller d'Albert Inc.; Geoboring and Development Inc.; GE Appliances; Geopier Foundation Co.; Gibson Door Inc.; Graham Steel Corp.; Great Graphics & Sign; Halton Lift Truck; Harris Electric Inc.; Harvard Steel Inc.; Insulation Contractors Inc.; Interstate Door Sales; Irriscapes Inc.; ISEC Inc.; John Wayne Construction Co.; J&S Masonry Inc.; KJM & Assoc. Ltd.;

KLBConstruction Inc.; Lair-Swanson; Lakeside Industries; Landau Assoc. Inc.; Majestic Painting & Design; Martens/Chan; McKinstry Co.; Mehrer Drywall Inc.; Meriwether Leachman Assoc.; Mid Pac Tennis; Meridian Project Systems Inc.; Nordahl; Northshore Sheet Metal Inc.; NW Assoc.; NWR (Northwest Recreation); Barbara Oakrock; Olympic Foundry; Pacific Erectors Inc.; Progressive Athletics Inc.; Pacific Construction Systems; Pacific Glass Inc.; Philip Environmental; Pilchuck Mechanical Inc.; Pioneer Door Inc.; Profile Steel Inc.; Pacific Rainier Roofing Inc.; P.S. Construction/Supply Corp.; PSC; Restec Contractors Inc.; R.W. Rhine Inc.; Rose City Flags and Flag Poles; RTB Co. Inc.; Rubenstein's Contract Carpet LLC; Safe Guard Surfacing Corp.; Salmon Bay Sand & Gravel Co.; Seattle Engineering Department; Seattle Fire Marshall; Skyline Tile Inc.; Sound Elevator Co.; Special-T Plus; Sport System International; Stagecraft Industries Inc.; Sports Technology Group; Stowe Construction Inc.; Sea Trans; SvR Design

Consultants;

Sweeping Services; T&T Contractors Inc.; Technical Furniture Systems Inc.; Team Mechanical; Towne, Richards & Chaudiere Inc.; Washington Precast Products; Washington Contractor Services; West Pac Environmental Inc.; Won Door Corp.; Wood/Harbinger Inc.; Westmark Products Inc.; and Zesbaugh Inc.