| |
Project description: Originally built in 1967, this project will not only expand the facility, but create a lighter, more open facility that will accommodate leading edge technology. Phase One involves a 70,600-square-foot addition being built around the existing building. Phase Two, an 86,800-square-foot remodel, will begin when the first phase is completed. Construction will be phased so the library can remain in continuous operation.
Contract amount: $13,397,600
Start of construction: August 1995
Expected completion date: February 1998
Contractor: Shea Construction, Box 11954, Spokane, WA 99211, 509-534-1030
Architect: ALSC Architects, The Liberty Building, Suite 400, 203 N. Washington, Spokane, WA 99201, 509-838-8568
Owner: Eastern Washington University
Project participants:
SMK Mechanical; Mackin & Little; Shamrock Paving; Inland Empire Re-Steel; Great Northern Masonry; Modern Glass of Spokane; Luchini Tile & Terrazzo; Interior Systems; Osmonsom Painting; Grimmell Fire Protection; Intermountain Electric; MJM General Contractors; Malcolm Drilling; Marjan Construction, Inc; Ray's Demolition; Nelson Landscaping; GBC Construction; LH Sowles; Thermo-Guard; Krueger Sheet Metal Co; Yadon Construction Specialties; Pella Products; Pacific Construction Systems; Performance Contracting; Montgomery Elevator; JMJ Supply; Lunden Construction Products; Central Pre-Mix Concrete; Olympia Precast, Inc; Flaig Steel & Fabricating; North Star Industries; Quality Millwork; Architectural Hardware; Stiles Hollow Metal; Drake Forest Products; Anderson Specialties; Mosler, Inc; Window Coverings; Evergreen Fire; IPC Door & Wall Protection Systems; Sitelines Park & Playground Equipment; J & R Interiors; PS Construction Supply; Twardus Iron & Wireworks, Inc; Contractors Supply; Dupree Building Specialties;and L & L Signs.