#21. New Hockinson High School

Original contract amount: $15,346,000

The new high school will be a first for the Hockinson School District.
Image courtesy of LSW Architects

Project address:
16819 N.E. 159th St., Bush Prairie

Start of construction:
April 11, 2002

Expected completion date:
Summer 2003

Owner:
Hockinson School District No. 98


Description
Construction of Hockinson High School gives students of Hockinson School District the first high school of their own.

LSW Architects from Vancouver led the design and facilitated a two-day symposium for the design process with the community, school leaders and students to create the building program and begin the schematic design.

The 135,000-square-foot, two-story school will be built with steel and concrete construction and a two-ply roofing system to hold an initial 850 students.

School planners anticipate growth and the district can increase class space as needed by building an additional classroom wing.

Facilities will feature a progressive vocational technology center, science classrooms, computer labs and general use classrooms.

The gym will seat 1,400 people and features an indoor running track. The multipurpose/community room facility highlights a performance platform, complete with fold out auditorium seating, for plays and musical performances.

The school was designed as a landmark to serve the community as a whole. The public will have library access outside of school hours, including a spectacular view of Mt. Saint Helens from inside the library.

PROJECT PARTICIPANTS

Contractor:
Baugh Skanska, 2555 S.W. 153rd Drive, Beaverton, OR 97006, (503) 641-2500

Project Manager:
Educational Service District 112, 2500 N.E. 65th Ave., Vancouver, WA 98661-6812, (360) 750-7500

Architects:
LSW Architects, 2300 Main St., Vancouver, WA 98660, (360) 694-8571

Matela Associates (landscape)

Engineers:
Harper Houf Righellis (civil)
Interface Engineering (mechanical)
Kramer-Gehlen & Associates (structural)
MKE & Associates (electrical)


Other Participants
Access Control Systems
Aluminum and Bronze Fabricators
Architectural Metal Works
Asphalt Maintenance Group
Atlas Track
BC Installation
Bell Hardware
Brundage Bone
Campbell Crane & Rigging Service
Cascade Sound
Central Pre-Mix Prestress Co.
Crawford Roll-Lite Doors
Custom Precast
CWP Inc.
Deamor Associates
Delta Fire
Eagle Roofing
Eudaly Bros.
Farwest Steel
Fire Chief Equipment
Fireside Distributors
Fox Architectural Signs
Geocon Northwest
Global Food Service Supply
Halliday Associates
Interior Technology
Jack Massie and Sons
J & R Paving
Lab Design Co.
Lynnco Inc.
Market Contractors
Minister-Glaeser Surveying
North Central Supply
Northwest Fireproofing
Northwest School Equipment
Northwest Signal Supply
Pacific Landscaping
Pacific NW Painting Co.
Pacific Rock Products
Patent Construction Systems
Pole Tech
Powers West Corp.
Prairie Electric
Ray’s Plumbing
RGL Enterprises
Robert Lloyd Sheet Metal
Sawtooth Caulking
Stagecraft Industries
Steel Dog Frame & Door
Superior Fencing
The Ogilvie Co.
ThyssenKrupp Elevator Corp.
Twin City Glass
West Coast Wallboard
Western Hardwood
Westmark Co.
White Shield
Willamette Valley Steel