Evergreen High School remodel, addition |
|
|
Project description: Work consists of remodeling 220,000 square feet of existing building and constructing additions totaling 44,000 square feet to the existing Evergreen High School. Site modifications are included.
Address: 14300 N.E. 18th St., Vancouver Cost: $39.97 million (guaranteed maximum price) Type of contract: General contractor/ construction manager Start of construction: Dec. 1, 2005 Expected completion date: Sept. 1, 2007
Contractor:
Robinson Construction Co.,
Architect:
LSW Architects, 2300 Main St., Owner: Evergreen School District
Project participants:
Able Fence
Academy Specialties
Architectural Signing
Northwest
Atlas Track & Tennis
B. Gentle Concrete
Burgeners Woodworking
Chown Hardware
Cisco-Eagle
Daktronics
Dan Hunt & Associates
Davis Landscape
Diversified Installation
Engineered Products
Finetex International
Floor Solutions
Froelich Consulting Engineers
(structural)
George Goddard Inc.
Grant Supply
Halliday & Associates (food
service consultant)
Harlens Drywall
Howards Painting Service
Hydro-Temp Mechanical
InPro Corp.
Interface Engineering
(mechanical)
Interior Technology
J&S Masonry
Johns Waterproofing
Lakeside Industries
Lemons Millwork
LifeRax
Master Fire Control
Matela & Associates (landscape
architect)
Minister Glaeser
MKE & Associates (electrical
engineer)
North Pacific Glass
Northwest School Equipment
Nuprecon
Nutter Corp.
Overhead Door Co.
Patriot Pavement
Development
PBS Environmental (civil)
PBS Supply
Porter Athletic Co.
Prairie Electric
Quiet Floors
Raymond Handling Concepts
Roof Toppers
Schindler Elevator
Shimer Steel
Simonis & Associates
Skyline Sheet Metal
Smith & Greene
Sowles Co.
Spectrum Specialty Builders
SSA Acoustics (acoustical
engineer)
Stagecraft Industries
The Concrete Shop
Thomas Kay Textiles
Tower Woods
T-Plus Fabrications
Triple I Interiors
Trus Joist
W.H. Cress Co.
|