North Close Custody |
|
|
Project description: The Washington State Penitentiary North Close Custody Facility expansion, phase 1, is a 326,000-square-foot design-build, fast-track, lump-sum project. It is being built on 103 acres adjacent to the existing penitentiary. The project consists of four new housing units containing 528 close-custody cells and 198 intensive management unit cells with related site development, support buildings and utilities. The support buildings include: an administration building; visitation building; multipurpose core building including food service, wellness and education; and a motor pool and automotive vocational training building.
Address: 1415 N. 13th Ave., Walla Walla Cost: $105 million (design and construction) Type of contract: Design-build Start of construction: March 2005 Expected completion date: March 2007
Design-builder:
HDR/Turner, 1415 N. 13th Drive, Owner: Washington State Department of Corrections
Project participants:
Clanton & Associates
(lighting) —
Conley Engineering
(telecommunications) —
Crosby Group (structural) —
Engineered Control Systems
(security electronics) —
HDR (landscape/civil/LEED) —
Lea Electric/DC Engineering
(electrical design-build) —
Oldcastle Modular Precast
Group (modular precast
cells) —
Romano/Gatland (food service) —
Shannon and Wilson
(geotechnical) —
Southern Folger (hardware) —
Turner Logistics (mechanical
and electrical equipment) —
YMC Inc./Engineering Inc.
(mechanical design-build)
|