Scaffolding was installed over the side of the bridge and back under to access the work area. The bottom of the bridge is about 135 feet above Lake Union.
Crews tied an I-beam on the bridge to the stringer below the deck. This took weight off the stringer so that crews could cut out the damaged part of the stringer.