homeWelcome, sign in or click here to subscribe.login
     


 

 

Real Estate


print  email to a friend  reprints add to mydjc  

June 11, 2026

Work begins on 37-room hotel at Swedish Cherry Hill

By BRIAN MILLER
Real Estate Editor

Rendering via Synergy [enlarge]
The Candlewood project has terraces and an in-house cafe.

The land sale was 13 years ago at 505 16th Ave., on the corner of Jefferson. The long-vacant 4,800-square-foot site is inset within the structured parking garage on the Swedish Cherry Hill campus, so it’s easy to miss — or mistake it for being hospital-owned. But it’s not. Hotel plans emerged in 2020, and the master use permit came four years later.

Work on the six-story, 37-room project began this month under Synergy Construction. Axis Architecture designed the project, which totals about 23,056 square feet. There are some amenities, but no parking is included.

Photos via Earth Solutions NW [enlarge]
Groundwork began this month.

The Candlewood Suites brand is still attached to the endeavor. Its compact size could mean completion in 12 months or so. The construction is to be Type V-A wood over Type I-A concrete.

An Eastside investor owns the project. The team also includes Lanktree Land Surveying; JGM Landscape Architects; Lund Opsahl, structural engineer; DCI Engineers, civil; requested, Earth Solutions NW, geotechnical; Abossein Engineering, MEP; Gibson Traffic Consultants; and Ruffhouse Construction, shoring.


 


Brian Miller can be reached by email at brian.miller@djc.com or by phone at (206) 219-6517.




Email or user name:
Password:
 
Forgot password? Click here.