Welcome, sign in or click here to subscribe.
Login: Password:
     


 

 

  Construction

Subscriber content preview

January 7, 2014

More inspection shafts drilled for Bertha

Photos courtesy of WSDOT [enlarge]
Malcolm Drilling is drilling 5-foot-diameter shafts in front of Bertha to probe for additional blockages.

Crews have begun drilling 5-foot-diameter shafts in front of Bertha, the tunnel boring machine digging the SR 99 replacement tunnel for the Alaskan Way Viaduct. The shafts are being installed where earlier probing detected metal in front of the machine.


 
. . .


To read this story in full login or purchase a subscription.


Search Stories
 Find:
 With:
 In:
 Depth:
 Sort by:
Advanced options

--