![]() |
Subscribe / Renew |
![]() |
Contact Us |
► Subscribe to our Free Weekly Newsletter |
home | Welcome, sign in or click here to subscribe. | login |
![]() ![]() ![]() | ![]() |
![]() |
November 7, 2014
Location: Snohomish
Mason contractor: R&D Masonry
Architect: Dykeman
Owner: Snohomish School District
General contractor: Absher Construction
Valley View Middle School is designed to be a leading institution for both educational delivery and sustainable practice.
The International Living Building Institute’s Living Building Challenge was used as a guideline for the school’s sustainable design elements and technologies. Locally sourced brick played a key role to satisfy both envelope and sustainability goals.
Other strategies for the design team included use of envelope design to reduce energy demand, solar and geothermal technology, rainwater harvesting, integrated value messaging and interpretive signage.
The new school uses less energy than the previous 1981 school that was half the size.
Other Stories: