Welcome, sign in or click here to subscribe.
Login: Password:
     


 

 


  Architecture & Engineering

Design
Perspectives

By Clair Enlow

Subscriber content preview

December 3, 2008

Design Perspectives: Team ‘steps up' proposal for Civic Square design

  • Updated design plans show better street connections, weather protection, pedestrian access and a retail wing that frees up room for a green roof.
  • By CLAIR ENLOW
    Special to the Journal

    The first tests of the relationship between the city of Seattle and Triad Development are over. The marriage — and the Civic Square project — is still on, but it may be a long wait.

    The anticipated result of this public-private liaison is a new complex right in front of City Hall on the block between Cherry and James streets and Third and Fourth avenues. Now part of a project referred to as 601 Fourth Avenue, it includes a 42-story office and residential tower accompanied by a dynamic and sculptural public plaza. There will be retail buildings on the south and west sides, parking and a transit station.


     
    . . .


    To read this story in full login or purchase a subscription.



    Previous columns:

    Search Stories
     Find:
     With:
     In:
     Depth:
     Sort by:
    Advanced options