![]() |
Subscribe / Renew |
![]() |
Contact Us |
► Subscribe to our Free Weekly Newsletter |
home | Welcome, sign in or click here to subscribe. | login |
![]() ![]() ![]() | ![]() |
![]() |
July 23, 2020
Hampton Inn & Suites Seattle Downtown
Location: Seattle
Contractor: Phampena
Architect: Jensen Design Architects
Team: Cement Masons and Plasterers Local 528, Evergreen Building Products, BASF
The Hampton Inn & Suites is nestled in the heart of downtown Seattle within walking distance of the Space Needle, Seattle Center, waterfront and Pike Place Market.
Hotel developer Paul Pong selected Phampena to be the plastering contractor. Because the hotel was still open to guests, construction had to be done in phases.
Phampena streamlined the process by using the Senergy Channeled Adhesive Design System. An air-and-weather barrier product was applied to existing sheathing, followed by an application of EPS foam, Senergy reinforcing mesh and basecoat, and, finally, a self-cleaning acrylic finish. The final touch was Senergy sandable basecoat with primer and two coats of color for a smooth finish. The Synergy Channeled Adhesive Design System was chosen for this project for the benefits of continuous insulation and self-cleaning finishes.
Judges’ comment: “The crisp lines and smooth surfaces created by the Phampena team on the Hampton Inn & Suites look perfect, and the continuous insulation exterior will deliver an energy-efficient, low-maintenance operation.”
Other Stories: