homeWelcome, sign in or click here to subscribe.login
     


 

 

Construction


print  email to a friend  reprints add to mydjc  

October 14, 2021

Residential Less than $5 million

Photo courtesy of ABC
SKIS workers painted 266 condo units and this rooftop ballroom at The Emerald.

The Emerald
SKIS Painting

Location: 121 Stewart St.Seattle

The Emerald is a 41-story, 381,571-square-foot residential tower built by Andersen Construction and located near the historic waterfront of downtown Seattle. The SKIS crew worked over 34,000 hours, painting 266 luxury condo units and amenities along with a full parking structure.

Named a Hot Project of 2018 by Forbes Magazine, the luxury condos that comprise this facility include access to a fitness center, yoga studio and dog washing room. The building includes several furnished outdoor terraces, all of which were given professional coatings to wood, metal, concrete, and walled surfaces by the SKIS team.

The Emerald sits on less than 1 acre, only taking up a tight quarter block near Seattle’s waterfront, making construction of this project logistically challenging. SKIS was not only able to manage production challenges within a very limited space, but also successfully implement a thorough COVID-19 plan for worker safety and health. The Emerald remains SKIS Painting’s largest and most successful project to date.


Other Stories:



Email or user name:
Password:
 
Forgot password? Click here.